Connecting Mullions

Connecting Mullions

#
Summary
Link
Date
1.
As one-time solution for the project ‘10-14 South Street, Jersey City' it was allowed to use pre-cut EZ mullion reinforcements in order to solve the issue with clearance.
OTS #8
9/6/2024
 2.
 As a one-time solution for the project ‘24268 HUB on Campus - Ann Arbor,’ the EZ Mullion Cap length rules and milling dimensions have been revised. Drawing ID-0000028-124, indicating the updated milling dimensions, has been prepared.
 11/29/2024
 3. 
 As a one-time solution for the project ‘20916 Marriott Dual Brand - AC Hotel and Element - Boise,’  EZ mullion caps AZP000000480 and AZP000000481 were sent in full length to be cut on site. 
 8/23/2024
 4.
 As a one-time solution for the project ‘24476 61 Hall Street,’  a non-standard EZ mullion installation for a fixed window with a solid filler was approved. This type of window installation is recommended when there is no slab installed (Drawing ID-0000028-106.V1).
 5/13/2024   5/23/2024
 5.
 As a one-time solution for the project ‘20087 The Pinnacle North Bethesda,’  a specific drawing (ID-0000028-100) of PBO aluminum doors + connecting mullion (FL 120x10) + Supera 74, AW window has been created. This solution requires an additional 3254 profile to cover the 120x10 reinforcement. Additional drawing with cut sections and milling instruction for profile 7281 were provided a bit later (ID-0000028-100.V2).
 4/4/2024   4/24/2024
 6.
 As a one-time solution for the project ‘20087 The Pinnacle North Bethesda,’ a one-time drawing (ID-0000102-25) was created to show connectors extending to the ground on the side of the knee wall as per the client's request.
 3/20/2024
 7.
 The use of reversed EZ mullions for the project '18505 Bronx Cluster - 708 - 710 and 738 - 740 E 243rd St' was approved as a one-time solution due to interior columns behind the window units, with production unchanged and the client informed of sealing and visibility requirements.
 12/12/2024



    • Related Articles

    • Corner Mullions

      # Summary Link Date 1. As a one-time solution for the project ‘23636 280 8th Avenue', drawings for Corner mullion 2304 + frame 8001 has been updated, including a version without widening, new screw hole placements, and added dimensions. OTS #28 ...
    • Add-on

      # Summary Link Date 1. As a one-time solution for the project ‘23596 Park Lane (Dallas, TX),’ add-on mullions around all windows where EZ-mullion is used on the interior side were approved, and cutting instruction ID-0000028-123 has been prepared. ...
    • Size limitations

      # Summary Link Date 1. As a one-time solution for the project '23500 27th and Tschache Lane' window positions with narrow Integral Mullions were allowed. OTS #4 11/5/2024 2. As a one-time solution for the project '20087 The Pinnacle North Bethesda' ...