# | Summary | Link | Date |
1. | A one-time solution has been approved for the project 15821 at 784 Courtlandt Ave. to use 90-degree glazing beads for narrow louvers in two window positions, while standard glazing beads will be used for the IGU below. | OTS #1 | 10/11/2024 |
2. | A one-time solution has been approved for the project's '26005 Gowanus Green Mixed Use Complex Building A" VMO to adapt INTUS louver for connection with Epocha HPAC unit and Thermaduct plenum. | 11/15/2024 | |
3. | A one-time solution has been approved for the project ' ' to produce the louver with a width of 2608 mm, exceeding the allowed maximum width of 2456 mm. | 9/10/2024 |