| # | Summary | Link | Date |
1. | As a one-time solution for the project '21576 Hub on Campus - Raleigh' receptors with pre-installed end plates were allowed, and installation instructions for production have been prepared. | OTS #10 | 9/24/2024 |
2. | As a one-time solution for the project '24268 HUB on Campus - Ann Arbor' receptors with pre-installed end plates were allowed, packing and installation instructions for production have been prepared. | 11/18/2024 | |
3. | As a one-time solution for the project '21576 Hub on Campus - Raleigh', an expanding tape solution (AZA000000340) was chosen to address potential water tightness issues, instruction ID-0000015-6 detailing on-site application was provided. | 9/13/2024 | |
4. | As a one-time solution for the project '21576 Hub on Campus - Raleigh' receptor length is reduced to be window size + 1/4", a new packing scheme for pre-cut Head Receptors with end plates has been prepared. | 7/19/2024 | |
5. | As a one-time solution for the project P35555 42-76 Hunter Street DX, pre-cut receptors with groove profiles are approved for use with adjustable and corner mullions. Component calculations and profile sketches are completed in the drawing ID-0000028-183. Part AZA000000508 is supplied pre-cut for straight configurations only and may require additional on-site cutting per instructions ID-0000015-2-7.2.V1, pages 35–36. | 12/16/2025 |