Shadow Box

Shadow Box

#
Summary
Link
Date
 1.
 As a one-time solution for the project ‘23776 St Paul's school. FLEISCHNER FAMILY ADMISSIONS CENTER,' a non-standard Shadow Box position was approved, and due to a change in the mounting place, the lengths of pre-cut Shadow Boxes differed from the default rules.
 3/28/2024
 2. 
 As an update to the one-time solution for the project '18166 Phase 2 – Jackson Place', in addition to Sulfur Yellow RAL1016 (AAMA 2605) for Shadow Box MC063, the Azure Blue RAL5009 (AAMA 2605) color has been approved for Shadow Box MC063 and SB40, including cap profiles, end plates, and screws.
 10/16/2025
 3. 
 As a one-time solution for the project ‘16866 The Highbridge - 1387 University Ave, Bronx, NY,’ it was approved to position the shadow box 18 mm from the head to avoid interference with the lintel flashing (ID-0000028-148.V2).
 3/24/2025
4.
P18220 NJ P.A.C. L&M Midrise, Newark, NJ (Performing Arts Center) - New custom more narrow shadow box has been created. 
01/02/2026
5.
P18220 NJ P.A.C. L&M Midrise, Newark, NJ (Performing Arts Center) - Update to the base plate profile MC147D_A - round d13mm access hole changed to slot. 
01/15/2026




    • Related Articles

    • Machinery Operations

      # Summary Link Date 1. As a one-time solution for the project ‘24526 Weiss Farm', the mount holes operation code for doors was tested on the 8012 profile using the FC2000 machine, and Operation 4401 was found to be correct and usable. OTS #32 ...
    • Profile Lamination

      # Summary Link Date 1. As one-time solution for the project ‘28756 11th & Ferry Apartments' new profile 8001 with extra lamination on profile bottom was added to the system (AZP040000692). OTS #6 10/10/2024 2. As one-time solution for the project ...