| # | Summary | Link | Date |
1. | As a one-time solution for the project ‘23776 St Paul's school. FLEISCHNER FAMILY ADMISSIONS CENTER,' a non-standard Shadow Box position was approved, and due to a change in the mounting place, the lengths of pre-cut Shadow Boxes differed from the default rules. | 3/28/2024 | |
2. | As an update to the one-time solution for the project '18166 Phase 2 – Jackson Place', in addition to Sulfur Yellow RAL1016 (AAMA 2605) for Shadow Box MC063, the Azure Blue RAL5009 (AAMA 2605) color has been approved for Shadow Box MC063 and SB40, including cap profiles, end plates, and screws. | 10/16/2025 | |
3. | As a one-time solution for the project ‘16866 The Highbridge - 1387 University Ave, Bronx, NY,’ it was approved to position the shadow box 18 mm from the head to avoid interference with the lintel flashing (ID-0000028-148.V2). | 3/24/2025 | |
4. | P18220 NJ P.A.C. L&M Midrise, Newark, NJ (Performing Arts Center) - New custom more narrow shadow box has been created. | 01/02/2026 | |
5. | P18220 NJ P.A.C. L&M Midrise, Newark, NJ (Performing Arts Center) - Update to the base plate profile MC147D_A - round d13mm access hole changed to slot. | 01/15/2026 | |
6. | As a one-time solution for P18923 22 Fulton Tower DX, Aluminum Shadow Box 299 may be supplied unpainted to allow the client to apply a project-specific color finish. Shadow boxes will be delivered with plates, pre-cut and pre-installed gaskets, and pre-cut caps. The approval applies to both the mock-up and main order. | 6/17/2026 |