# Summary Link Date 1. As a one-time solution for the project ‘29338 Dominion Square West - South Side', non-standard steel L angle 40x72x3mm (AZP000000247) was specified to be supplied in full length, and this information was included in the shop ...
Connecting Mullions
# Summary Link Date 1. As one-time solution for the project ‘10-14 South Street, Jersey City' it was allowed to use pre-cut EZ mullion reinforcements in order to solve the issue with clearance. OTS #8 9/6/2024 2. As a one-time solution for the ...
Add-on
# Summary Link Date 1. As a one-time solution for the project ‘23596 Park Lane (Dallas, TX),’ add-on mullions around all windows where EZ-mullion is used on the interior side were approved, and cutting instruction ID-0000028-123 has been prepared. ...
Louvers
# Summary Link Date 1. A one-time solution has been approved for the project '15821 at 784 Courtlandt Ave.' to use 90-degree glazing beads for narrow louvers in two window positions, while standard glazing beads will be used for the IGU below. OTS #1 ...
Size limitations
# Summary Link Date 1. As a one-time solution for the project '23500 27th and Tschache Lane' window positions with narrow Integral Mullions were allowed. OTS #4 11/5/2024 2. As a one-time solution for the project '20087 The Pinnacle North Bethesda' ...