Add-on

Add-on

#
Summary
Link
Date
1.
 As a one-time solution for the project ‘23596 Park Lane (Dallas, TX),’ add-on mullions around all windows where EZ-mullion is used on the interior side were approved, and cutting instruction ID-0000028-123 has been prepared.
OTS #18
11/26/2024
 2.
 As a one-time solution for the project ‘26011 Azure 56 Unit,’ add-on profile around all window was approved, and the drawing ID-0000028-85 has been prepared.
 1/12/2024
 3.
 As a one-time solution for the project "23596 Park Lane (Dallas, TX)," add-on cutting rules ID-0000028-123.V1 have been updated to include the intersection of horizontal and vertical add-ons.
 2/6/2025
 4.
 As a one-time solution for the project "23596 Park Lane (Dallas, TX)," add-on cutting rules ID-0000028-123.V2 have been updated to include positions  at the head and sill, and at the head and sill for two types of corner mullions
 2/14/2025
 5. 
 As a one-time solution for the project '27721 Lynn St Apts - 78E Lynn St,' it was allowed to not use the Add-on in Z4 and to use the Small Add-on in Z5.
 2/18/2025
 6.
 As a one-time solution for the project '23051 HUB Chauncey - West Lafayette', the Add-on mullion was revised with a +42 mm extension to align with the bottom of the 7299 laminated undersill.
 5/21/2025
 7.
 As a one-time solution for the project '22073 712 Seagaze Dr (712 Seagaze Dr)', an approval for factory pre-installed small Add-on has been granted.
 6/25/2025
 8. 
 As a one-time solution for project ‘23203 301 W6th Street’, approval was given to cut the Add-on mullion reinforcement profile 3798 at a 45-degree angle for a production mock-up. Drawing ID-0000028-171 has been prepared with detailed rules for reinforcement length and cutting, while cap ends remain at 90 degrees with standard length rules.
 8/25/2025
 9. 
 As a one-time solution for project ‘23203 301 W6th Street’, approval was given to cut the Add-on mullion reinforcement profiles 3798 and 27720 at a 45-degree angle for a main order. Drawing ID-0000028-171-1.V1 has been prepared with detailed rules for reinforcement length and cutting. Length formulas for polymer caps have been provided.
 8/27/2025
 1/12/2026
 1/14/2026
 10.
As a one-time solution for the project P29592 Tempo by Hilton Tucson Uptown – Tucson (7401 N La Cholla Blvd), the use of pre-installed Add-on mullions has been approved.
 11/14/2025




    • Related Articles

    • Additional Profiles

      # Summary Link Date 1. As a one-time solution for the project ‘29338 Dominion Square West - South Side', non-standard steel L angle 40x72x3mm (AZP000000247) was specified to be supplied in full length, and this information was included in the shop ...
    • Additional Profiles

      # Summary Link Date 1. As a one-time solution for the project ‘29338 Dominion Square West - South Side', non-standard steel L angle 40x72x3mm (AZP000000247) was specified to be supplied in full length, and this information was included in the shop ...
    • Connecting Mullions

      # Summary Link Date 1. As one-time solution for the project ‘10-14 South Street, Jersey City' it was allowed to use pre-cut EZ mullion reinforcements in order to solve the issue with clearance. OTS #8 9/6/2024 2. As a one-time solution for the ...
    • Corner Mullions

      # Summary Link Date 1. As a one-time solution for the project ‘23636 280 8th Avenue', drawings for Corner mullion 2304 + frame 8001 has been updated, including a version without widening, new screw hole placements, and added dimensions. OTS #28 ...
    • Shadow Box

      # Summary Link Date 1. As a one-time solution for the project ‘23776 St Paul's school. FLEISCHNER FAMILY ADMISSIONS CENTER,' a non-standard Shadow Box position was approved, and due to a change in the mounting place, the lengths of pre-cut Shadow ...