Related Articles
Connecting Mullions
# Summary Link Date 1. As one-time solution for the project ‘10-14 South Street, Jersey City' it was allowed to use pre-cut EZ mullion reinforcements in order to solve the issue with clearance. OTS #8 9/6/2024 2. As a one-time solution for the ...
Corner Mullions
# Summary Link Date 1. As a one-time solution for the project ‘23636 280 8th Avenue', drawings for Corner mullion 2304 + frame 8001 has been updated, including a version without widening, new screw hole placements, and added dimensions. OTS #28 ...
Size limitations
# Summary Link Date 1. As a one-time solution for the project '23500 27th and Tschache Lane' window positions with narrow Integral Mullions were allowed. OTS #4 11/5/2024 2. As a one-time solution for the project '20087 The Pinnacle North Bethesda' ...
Add-on
# Summary Link Date 1. As a one-time solution for the project ‘23596 Park Lane (Dallas, TX),’ add-on mullions around all windows where EZ-mullion is used on the interior side were approved, and cutting instruction ID-0000028-123 has been prepared. ...
Receptors
# Summary Link Date 1. As a one-time solution for the project '21576 Hub on Campus - Raleigh' receptors with pre-installed end plates were allowed, and installation instructions for production have been prepared. OTS #10 9/24/2024 2. As a one-time ...